Development
of New Greenfield Airport and New Passenger Terminal
Project
Name :
Khartoum
New International Airport
Location:
Khartoum,
Republic of the Sudan
Client:
Civil
Aviation Authority of Sudan / Dorsch Consult Ing.
mbH
Project
Duration:
November
2003 - March 2005
Project
Description:
The overall
scope of work included the development of a new
greenfield airport which included the development
of a new passenger terminal expected to handle
7.5 million annual passengers. The overall project
scope included:
Assessment
and Analysis of Existing Airport Facilities
Action
Plan Development
Recommendations
for proposed airport sites considered feasible
for constructing a new greenfield airport
Airport
Master Plan development for the recommended
site
Complete
Detailed Design Services
Services
Rendered:
Services
completed by aviatDesign, Inc. included:
Data
Collection - Meetings with Governmental Authorities,
Development Agencies and Civil Aviation Authorities.
Analysis
and assessment of existing airport facilities
Analysis
/ Recommendations for proposed airport site
locations
Preparation
and coordination of tender phase for carrying
out geotechnical services for 3 recommended
airport sites. Services included the preparation
of Request for Qualification (RfQ), Request
for Proposal (RfP), tender evaluation and contract
documents for the excavation of trial pits,
core drilling and soil sampling / testing. Upon
award of contract, construction supervision
services were carried out for the completion
of the contract.
Complete
Space Programming for the New Passenger Terminal
Facility, Hajj Terminal, Existing Domestic Terminal,
Existing International Arrivals Terminal and
Existing International Departure Terminal.
Preparation
of an Action Plan Report for all aforementioned
terminal facilities which outlined recommendations
for enhancing the current airport facilities
to meet the expected passenger demand until
the new airport development program is implemented.
Services included the preparation of architectural
"as-built" drawings, recommended architectural
layout drawings depicting terminal enhancements
for providing an increased level of passenger
service, illustration and technical description
of all proposed improvements, development of
Rough Order of Magnitude Costing and presentation
to governmental authorities.
Terminal
design consultancy services for the new proposed
passenger terminal facility expected to handle
7.5 million passengers annually.
Completion
of Detailed Design Drawings for the proposed
Administration Building / ATC Complex.