Kuwait
International Airport
Optimization of Existing Passenger Terminal
Location:
Kuwait
City, Kuwait
Client:
Kuwait United Construction Management / Dorsch
Consult Ing. mbH / SSH
Project
Duration:
March
2004 - May 2004
Project
Description:
A Passenger
Terminal Feasibility Study was conducted in order
to assess the maximum traffic capacity which the
existing terminal building could accommodate.
The study also included the preparation of recommendations
for expanding facilities and optimizing airport
operations in order to handle a capacity of up
to 10 million passengers annually. The overall
project scope included:
Assessment
and Analysis of the existing passenger terminal
building
Analysis
of existing and future Peak-hour Passenger Traffic
volumes.
Preparation
of recommendations for enhancing terminal facilities
Services
Rendered:
Services
completed by aviatDesig, Inc. included:
Data
Collection - Meetings with airlines and civil
aviation authorities.
Analysis
and assessment of existing passenger terminal
facility.
Preparation
of a study outlining the existing and future
peak-hour traffic volumes.
Preparation
of terminal space program outlining existing
areas and recommended areas for all passenger
functional areas.
Architectural
design and operational recommendations for enhancing
the existing passenger terminal in order to
accommodate additional traffic volumes.
Recommendations
for construction phasing in order to implement
the terminal enhancements while maintaining
terminal operations.
Preparation
of Rough Order of Magnitude (ROM) Costing for
all proposed recommendations.