Project
Duration:
April
2006 – October 2006
Project
Description:
In 2006,
the Terre Haute International Airport Authority
elected to implement an airport expansion program
which included the modernization and expansion
of the existing passenger terminal facility, terminal
curbside and aircraft apron area.
The program criteria foresaw the implementation
of commercial aircraft which were to utilize the
existing terminal facility and aircraft apron.
Services
Rendered:
Services
completed by aviatDesign, Inc. included:
An on-site assessment of the existing airport
facilities including the passenger terminal,
terminal aircraft apron, airport access roads
and terminal related parking areas. All areas
were inspected and assessed for their quality
and overall design.
Data Collection.
Preparation
of a terminal space program which established
the facility requirements of the terminal and
outlined all functional spaces and equipment
required within the passenger terminal. Furthermore,
the aircraft fleet-mix and critical aircraft
were evaluated and all planning parameters were
considered for adoption into the planning of
the Schematic Design Documents.
Preparation
of Schematic Design Concepts illustrating various
alternatives for expanding the existing terminal,
airside apron and curbside area.
Development
of Rough Order of Magnitude (ROM) costs for
each proposed concept.
Preparation
of architectural Design Development Documents
including Floor Plans, Elevations, Sections
and 3-D renderings for the proposed 2-level
Passenger Terminal expansion.
Development of aircraft
parking configurations including alternatives
for implementing Passenger Boarding Bridges.
Preparation
of Shadow Study for each proposed aircraft configuration.
Preparation of a Design
Development Report which outlined the various
terminal, airside and landside development schemes.